Who knows where all these wires and pipes go?
Wiring behind the front dash.
Walls being air lifted in
Very solid aluminum frame.
Slide outs waiting to be married to a couch.
There are 27 stations on the line. Every thing to be installed at that station is completed in an hour and forty five minutes.
Air is applied to the orange pads and
the rig is pushed over to the next station. Motorhome air hockey.
After the 27th station the completed couch is sent to paint, then returned for final inspection and detailing. I was very impressed with the quality of construction.